2013Guisuanyan tongbaoRequires access

Phase Formation of SO_3 Doped Portland Cement Clinker

Xiaodong Shen

Open publisher page 1 citations

Abstract

Impact of the addition of 3%SO3 on the formation of cement clinker minerals in industrials clinker was investigated.Variation of the C4A3$ during sintering process was taken into account.Sintering process of the cement clinker was investigated with DSC-TG,X-ray diffraction and microscopic analysis.Results showed that with a higher SO3 content existed,C4A3$ could formed at 1050 ℃ and decomposed to C3A and C$ from 1290 ℃;C3S formed after 1350 ℃ and f-CaO content dropped to 1% at 1450 ℃.The final clinker had 6.2%C4A3$.C4A3$ decomposed completely when held for 0.5 h at 1450 ℃.Calculation of the theoretical mineral formation was in agreement with the above conclusions.

About this research paper

What this paper is about

Impact of the addition of 3%SO3 on the formation of cement clinker minerals in industrials clinker was investigated.Variation of the C4A3$ during sintering process was taken into account.Sintering process of the cement clinker was investigated with DSC-TG,X-ray diffraction and microscopic analysis.Results showed that with a higher SO3 content existed,C4A3$ could formed at 1050 ℃ and decomposed to C3A and C$ from 1290 ℃;C3S formed after 1350 ℃ and f-CaO content dropped to 1% at 1450 ℃.The final clinker had 6.2%C4A3$.C4A3$ decomposed completely when held for 0.5 h at 1450 ℃.Calculation of the theoretical mineral formation was in agreement with the above conclusions.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Impact of the addition of 3%SO3 on the formation of cement clinker minerals in industrials clinker was investigated.Variation of the C4A3$ during sintering process was taken into account.Sintering process of the cement clinker was investigated with DSC-TG,X-ray diffraction and microscopic analysis.Results showed that with a higher SO3 content existed,C4A3$ could formed at 1050 ℃ and decomposed to C3A and C$ from 1290 ℃;C3S formed after 1350 ℃ and f-CaO content dropped to 1% at 1450 ℃.The final clinker had 6.2%C4A3$.C4A3$ decomposed completely when held for 0.5 h at 1450 ℃.Calculation of the theoretical mineral formation was in agreement with the above conclusions.

Key concepts: Clinker (cement), Materials science, Sintering, Cement, Portland cement, Mineralogy, Alite, Metallurgy

Related papers

Back to paper searchBrowse research topicsOriginal source
Phase Formation of SO_3 Doped Portland Cement Clinker — Research Paper | ScholarLens