To effectively minimize the siltation in Tianjin Port and after the comparison,design calculations and technical and economic analysis of various types of breakwater structures,a reinforced concrete cylindrical caisson structure was adopted for the second phase of the extension of the northern breakwater in Tianjin Port.The paper gives a description of the construction procedures of the breakwater.The structural members were massive in size and complex in technological process while the offshore conditions on site were severe and the construction duration was tight.Comparing with the rubble mound breakwaters and semi-circular caisson breakwaters,a breakwater of reinforced concrete cylindrical caisson structure is preponderant in quality,cost and construction duration.

About this research paper

What this paper is about

To effectively minimize the siltation in Tianjin Port and after the comparison,design calculations and technical and economic analysis of various types of breakwater structures,a reinforced concrete cylindrical caisson structure was adopted for the second phase of the extension of the northern breakwater in Tianjin Port.The paper gives a description of the construction procedures of the breakwater.The structural members were massive in size and complex in technological process while the offshore conditions on site were severe and the construction duration was tight.Comparing with the rubble mound breakwaters and semi-circular caisson breakwaters,a breakwater of reinforced concrete cylindrical caisson structure is preponderant in quality,cost and construction duration.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To effectively minimize the siltation in Tianjin Port and after the comparison,design calculations and technical and economic analysis of various types of breakwater structures,a reinforced concrete cylindrical caisson structure was adopted for the second phase of the extension of the northern breakwater in Tianjin Port.The paper gives a description of the construction procedures of the breakwater.The structural members were massive in size and complex in technological process while the offshore conditions on site were severe and the construction duration was tight.Comparing with the rubble mound breakwaters and semi-circular caisson breakwaters,a breakwater of reinforced concrete cylindrical caisson structure is preponderant in quality,cost and construction duration.

Key concepts: Breakwater, Caisson, Rubble, Siltation, Geotechnical engineering, Submarine pipeline, Port (circuit theory), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction of a Breakwater of Reinforced Concrete Cylindrical Caisson Structure — Research Paper | ScholarLens