Survey Control of Main Cable Erection of a Single Tower and Single Span Self-Anchored Suspension Bridge
Jie Yang
Abstract
Jie Yang
Abstract
The Pingsheng Bridge in Foshan City is a single tower and single span self-anchored suspension bridge with a main span 350 m and with four main cable planes.The Bridge is structurally novel and construction of the Bridge is technically difficult.In this paper,the methods for construction survey control of erection of the main cables of the Bridge are dealt with.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Pingsheng Bridge in Foshan City is a single tower and single span self-anchored suspension bridge with a main span 350 m and with four main cable planes.The Bridge is structurally novel and construction of the Bridge is technically difficult.In this paper,the methods for construction survey control of erection of the main cables of the Bridge are dealt with.
Key concepts: Bridge (graph theory), Tower, Span (engineering), Engineering, Suspension (topology), Structural engineering, Single strand, Forensic engineering