2009The World of Building MaterialsRequires access

Research in Construction Control of Continuous Rigid Frame Bridge with Long Span and High-low Pipers

Jianqiang Lv

Open publisher page 0 citations

Abstract

Based on Zhai Jiahe Bridge,the paper introduced the theory and methods of construction control in prestressed concrete continuous rigid frame bridge, and came up with some key-points of the construction control in the continuous rigid frame bridge with pipers in extremely different height.The effective construction controlling in Zhai Jiahe Bridge illustrates the reliability and practicability of the control methods the paper comes up with.Finally,some suggestions are proposed about the construction control in prestressed concrete continuous rigid frame bridge.

About this research paper

What this paper is about

Based on Zhai Jiahe Bridge,the paper introduced the theory and methods of construction control in prestressed concrete continuous rigid frame bridge, and came up with some key-points of the construction control in the continuous rigid frame bridge with pipers in extremely different height.The effective construction controlling in Zhai Jiahe Bridge illustrates the reliability and practicability of the control methods the paper comes up with.Finally,some suggestions are proposed about the construction control in prestressed concrete continuous rigid frame bridge.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on Zhai Jiahe Bridge,the paper introduced the theory and methods of construction control in prestressed concrete continuous rigid frame bridge, and came up with some key-points of the construction control in the continuous rigid frame bridge with pipers in extremely different height.The effective construction controlling in Zhai Jiahe Bridge illustrates the reliability and practicability of the control methods the paper comes up with.Finally,some suggestions are proposed about the construction control in prestressed concrete continuous rigid frame bridge.

Key concepts: Rigid frame, Bridge (graph theory), Structural engineering, Frame (networking), Prestressed concrete, Span (engineering), Reliability (semiconductor), Control (management)

Related papers

Back to paper searchBrowse research topicsOriginal source
Research in Construction Control of Continuous Rigid Frame Bridge with Long Span and High-low Pipers — Research Paper | ScholarLens