Construction Control of PC Continuous Rigid Frame Bridge
Liu Dai
Abstract
Liu Dai
Abstract
An introduction of construction control principal and methods of prestreesed concrete continuous rigid frame bridge is made and detailed construction control measures and results of Shuifumiao Bridge on Tan Shao Expressway are reported in this paper. Owing to the effective control, the alignment and the traffic safety are guaranteed after construction of this bridge.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
An introduction of construction control principal and methods of prestreesed concrete continuous rigid frame bridge is made and detailed construction control measures and results of Shuifumiao Bridge on Tan Shao Expressway are reported in this paper. Owing to the effective control, the alignment and the traffic safety are guaranteed after construction of this bridge.
Key concepts: Bridge (graph theory), Rigid frame, Frame (networking), Control (management), Structural engineering, Engineering, Principal (computer security), Computer science