Evolution and regulation works at Hechangzhou braided channel in Z-Y Reach of Yangtze River

Lin Mu-song

Open publisher page 2 citations

Abstract

The Zhenjiang-Yangzhou(Z-Y) Reach is one of the most severely changing sections in the lower Yangtze River.To stabilize the river regime,the phase Ⅰ and phase Ⅱ regulation works have been implemented for years on this reach,resulting in the substantial control of severe change of regime.The behaviors of the inflow and sediment,the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the Hechangzhou brai-ded channel are analyzed and the scheme researches,engineering design,construction and the effects of the control works at the entrance of the left branch of the Hechang sandbar are presented in the paper.Measured data show that the regulation works of Hechangzhou braieled channel intrance has attained predicated effect.

About this research paper

What this paper is about

The Zhenjiang-Yangzhou(Z-Y) Reach is one of the most severely changing sections in the lower Yangtze River.To stabilize the river regime,the phase Ⅰ and phase Ⅱ regulation works have been implemented for years on this reach,resulting in the substantial control of severe change of regime.The behaviors of the inflow and sediment,the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the Hechangzhou brai-ded channel are analyzed and the scheme researches,engineering design,construction and the effects of the control works at the entrance of the left branch of the Hechang sandbar are presented in the paper.Measured data show that the regulation works of Hechangzhou braieled channel intrance has attained predicated effect.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Zhenjiang-Yangzhou(Z-Y) Reach is one of the most severely changing sections in the lower Yangtze River.To stabilize the river regime,the phase Ⅰ and phase Ⅱ regulation works have been implemented for years on this reach,resulting in the substantial control of severe change of regime.The behaviors of the inflow and sediment,the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the Hechangzhou brai-ded channel are analyzed and the scheme researches,engineering design,construction and the effects of the control works at the entrance of the left branch of the Hechang sandbar are presented in the paper.Measured data show that the regulation works of Hechangzhou braieled channel intrance has attained predicated effect.

Key concepts: Shoal, Yangtze river, Channel (broadcasting), Inflow, River regime, Sediment, Phase change, Hydrology (agriculture)