This paper introduced the implementation of demolition technical measures of directional blasting regarding a demolition of two 120m height reinforced concrete chimneys.The introduction emphasized the localization of the blasting cut,the choice of blasting parameter,the protective measures of blasting security and so on.It also made a careful design and scientific discussion on the issues such as the directional accuracy which was the most hard to control regarding the site environment,collapse length and touch ground protection.And moreover,the paper checked the blasting and collapsing vibration.

About this research paper

What this paper is about

This paper introduced the implementation of demolition technical measures of directional blasting regarding a demolition of two 120m height reinforced concrete chimneys.The introduction emphasized the localization of the blasting cut,the choice of blasting parameter,the protective measures of blasting security and so on.It also made a careful design and scientific discussion on the issues such as the directional accuracy which was the most hard to control regarding the site environment,collapse length and touch ground protection.And moreover,the paper checked the blasting and collapsing vibration.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper introduced the implementation of demolition technical measures of directional blasting regarding a demolition of two 120m height reinforced concrete chimneys.The introduction emphasized the localization of the blasting cut,the choice of blasting parameter,the protective measures of blasting security and so on.It also made a careful design and scientific discussion on the issues such as the directional accuracy which was the most hard to control regarding the site environment,collapse length and touch ground protection.And moreover,the paper checked the blasting and collapsing vibration.

Key concepts: Demolition, Rock blasting, Reinforced concrete, Engineering, Structural engineering, Civil engineering, Forensic engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
BLASTING DEMOLITION OF TWO 120M HEIGHT REINFORCED CONCRETE CHIMNEYS — Research Paper | ScholarLens