Application of Water Shutoff with Jet Grouting Pile in Subway Subsurface Excavation Section
Mtr Construction
Abstract
Mtr Construction
Abstract
During construction of subsurface excavation section in saturate soil of Beijing Subway Line 5,the technology of constructing vertical jet grouting piles beside the tunnel at surface to form a water insulation pile wall is introduced.Construction technology of compounding with the pile wall and horizontal jet grouting piles in tunnel ensures safety of the tunnel.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
During construction of subsurface excavation section in saturate soil of Beijing Subway Line 5,the technology of constructing vertical jet grouting piles beside the tunnel at surface to form a water insulation pile wall is introduced.Construction technology of compounding with the pile wall and horizontal jet grouting piles in tunnel ensures safety of the tunnel.
Key concepts: Pile, Excavation, Geotechnical engineering, Engineering, Jet (fluid), Section (typography), Business, Aerospace engineering