Improved Dynamic Programming Algorithm for Traffic Engineering Routine Application of Safety Management System
Xiaobing Ding
Abstract
Xiaobing Ding
Abstract
After analyzing current safety condition of rail transit construction projects,data collection and collation by using rail traffic engineering safety management system was proposed;the optimal rail transit project construction period was obtained after analyzing data through improved dynamic programming model.As a result,the cost of rail construction could be cut to a certain extent which made this paper innovative and practical.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
After analyzing current safety condition of rail transit construction projects,data collection and collation by using rail traffic engineering safety management system was proposed;the optimal rail transit project construction period was obtained after analyzing data through improved dynamic programming model.As a result,the cost of rail construction could be cut to a certain extent which made this paper innovative and practical.
Key concepts: Dynamic programming, Transport engineering, Rail transit, Collation, Engineering, Data collection, Computer science, Transit (satellite)