2010Water Resources ProtectionRequires access

Study on constructed wetland of Buji Sewage Plant in Shenzhen

Chengwen Wang

Open publisher page 0 citations

Abstract

In order to improve the water quality of the Buji River in Shenzhen, and on the basis of earlier larger-scale experiments at the Buji Sewage Plant,a small-scale constructed wetland was constructed for advanced treatment of secondary effluent from the sewage plant.The improvement after advanced treatment of the secondary effluent by a constructed wetland was studied,providing a reference for whether the construction of a wetland should be planned after the construction of the Buji Sewage Plant is completed.The experimental results indicated that the constructed wetland had a quite significant advanced treatment effect on important water quality indexes such as COD,NH+4-N,TN,and TP of secondary effluent.The treatment effect was generally better in the summer than in the autumn and winter.The seasonal variation affected the removal rate of TN more significantly than that of COD,NH+4-N,and TP.

About this research paper

What this paper is about

In order to improve the water quality of the Buji River in Shenzhen, and on the basis of earlier larger-scale experiments at the Buji Sewage Plant,a small-scale constructed wetland was constructed for advanced treatment of secondary effluent from the sewage plant.The improvement after advanced treatment of the secondary effluent by a constructed wetland was studied,providing a reference for whether the construction of a wetland should be planned after the construction of the Buji Sewage Plant is completed.The experimental results indicated that the constructed wetland had a quite significant advanced treatment effect on important water quality indexes such as COD,NH+4-N,TN,and TP of secondary effluent.The treatment effect was generally better in the summer than in the autumn and winter.The seasonal variation affected the removal rate of TN more significantly than that of COD,NH+4-N,and TP.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to improve the water quality of the Buji River in Shenzhen, and on the basis of earlier larger-scale experiments at the Buji Sewage Plant,a small-scale constructed wetland was constructed for advanced treatment of secondary effluent from the sewage plant.The improvement after advanced treatment of the secondary effluent by a constructed wetland was studied,providing a reference for whether the construction of a wetland should be planned after the construction of the Buji Sewage Plant is completed.The experimental results indicated that the constructed wetland had a quite significant advanced treatment effect on important water quality indexes such as COD,NH+4-N,TN,and TP of secondary effluent.The treatment effect was generally better in the summer than in the autumn and winter.The seasonal variation affected the removal rate of TN more significantly than that of COD,NH+4-N,and TP.

Key concepts: Effluent, Wetland, Sewage, Environmental science, Constructed wetland, Sewage treatment, Water quality, Environmental engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on constructed wetland of Buji Sewage Plant in Shenzhen — Research Paper | ScholarLens