2003Unpublished venueRequires access

HIGH-VELOCITY AND HIGH-EFFICIENCY DEVELOPMENT TECHNOLOGY OF LOW-SUPER LOW PERMEABILITY RESERVOIR IN BLOCK WEI-2

Ma Xin, Zhi Wang

Open publisher page 0 citations

Abstract

The average permeability of block Wei 2 is (6.1~13.5)×10 3 μm 2, it is a comparatively integral low and super low permeability reservoir. In the process of developing block Wei 2, we took advantage of various development technologies, including reasonable development well pattern, synchronous water injection and oil production, improving injection production system continually, intensifying adjustment and control of injection production and reservoir stimulation. From the beginning of development, the field maintains a very good situation of high and stable productivity. The recovery velocity keeps at 1.9%~2.0% in five years, the comprehensive water cut is well controlled below 18% and all kinds of development indexes are significantly better that what they are in development plan. This paper mainly aims at introducing the measures to attain high-velocity and high efficiency development at block wei 2 and the effect.

About this research paper

What this paper is about

The average permeability of block Wei 2 is (6.1~13.5)×10 3 μm 2, it is a comparatively integral low and super low permeability reservoir. In the process of developing block Wei 2, we took advantage of various development technologies, including reasonable development well pattern, synchronous water injection and oil production, improving injection production system continually, intensifying adjustment and control of injection production and reservoir stimulation. From the beginning of development, the field maintains a very good situation of high and stable productivity. The recovery velocity keeps at 1.9%~2.0% in five years, the comprehensive water cut is well controlled below 18% and all kinds of development indexes are significantly better that what they are in development plan. This paper mainly aims at introducing the measures to attain high-velocity and high efficiency development at block wei 2 and the effect.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The average permeability of block Wei 2 is (6.1~13.5)×10 3 μm 2, it is a comparatively integral low and super low permeability reservoir. In the process of developing block Wei 2, we took advantage of various development technologies, including reasonable development well pattern, synchronous water injection and oil production, improving injection production system continually, intensifying adjustment and control of injection production and reservoir stimulation. From the beginning of development, the field maintains a very good situation of high and stable productivity. The recovery velocity keeps at 1.9%~2.0% in five years, the comprehensive water cut is well controlled below 18% and all kinds of development indexes are significantly better that what they are in development plan. This paper mainly aims at introducing the measures to attain high-velocity and high efficiency development at block wei 2 and the effect.

Key concepts: Petroleum engineering, Water cut, Permeability (electromagnetism), Water injection (oil production), Development plan, Oil production, Oil field, Block (permutation group theory)

Related papers

Back to paper searchBrowse research topicsOriginal source
HIGH-VELOCITY AND HIGH-EFFICIENCY DEVELOPMENT TECHNOLOGY OF LOW-SUPER LOW PERMEABILITY RESERVOIR IN BLOCK WEI-2 — Research Paper | ScholarLens