Installation and Construction Proposal for Steel Truss Arch Rib of the Main Bridge of Chongqing Chaotianmen Yangtze River Bridge
LI Zhuo-qin
Abstract
LI Zhuo-qin
Abstract
Large-span steel truss arch bridge utilizes crawler crane for arch rib installment,which is not only economical,but also safe,and a further improvement of cable lifting steel wire stayed knotting construction technique without support. According to the introduction of Chongqing Chaotianmen Great Bridge construction method,the cable lifting steel wire stayed knotting construction technique is detailedly analyzed,which can provide some reference for similar large-span arch bridges.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Large-span steel truss arch bridge utilizes crawler crane for arch rib installment,which is not only economical,but also safe,and a further improvement of cable lifting steel wire stayed knotting construction technique without support. According to the introduction of Chongqing Chaotianmen Great Bridge construction method,the cable lifting steel wire stayed knotting construction technique is detailedly analyzed,which can provide some reference for similar large-span arch bridges.
Key concepts: Truss, Arch, Span (engineering), Bridge (graph theory), Structural engineering, Yangtze river, Arch bridge, Engineering