2009Journal of Hunan University of Science and EngineeringRequires access

Effective control methods of construction cost in construction stage

Cai Xiang-chu

Open publisher page 0 citations

Abstract

Nowadays, the phenomenon of out-of-control construction cost in construction stage of our country is widely. Aiming at the phenomenon, analysis is made on the cost management’s problem in construction stage; the main reasons of out-of-control cost are found out. Meanwhile, a solution to the problem of there is not a normal phenomenon. This paper advances some measures for controlling effectively the construction cost in the construction stage from the management of construction contract, improving the construction plan and construction progress, designing alteration, strengthening the field signature management, and strengthening the management of the main material and equipment prices; so as to benefit the maximum investment benefit of projects construction.

About this research paper

What this paper is about

Nowadays, the phenomenon of out-of-control construction cost in construction stage of our country is widely. Aiming at the phenomenon, analysis is made on the cost management’s problem in construction stage; the main reasons of out-of-control cost are found out. Meanwhile, a solution to the problem of there is not a normal phenomenon. This paper advances some measures for controlling effectively the construction cost in the construction stage from the management of construction contract, improving the construction plan and construction progress, designing alteration, strengthening the field signature management, and strengthening the management of the main material and equipment prices; so as to benefit the maximum investment benefit of projects construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Nowadays, the phenomenon of out-of-control construction cost in construction stage of our country is widely. Aiming at the phenomenon, analysis is made on the cost management’s problem in construction stage; the main reasons of out-of-control cost are found out. Meanwhile, a solution to the problem of there is not a normal phenomenon. This paper advances some measures for controlling effectively the construction cost in the construction stage from the management of construction contract, improving the construction plan and construction progress, designing alteration, strengthening the field signature management, and strengthening the management of the main material and equipment prices; so as to benefit the maximum investment benefit of projects construction.

Key concepts: Construction management, Risk analysis (engineering), Control (management), Plan (archaeology), Pre-construction services, Phenomenon, Cost control, Investment (military)

Related papers

Back to paper searchBrowse research topicsOriginal source
Effective control methods of construction cost in construction stage — Research Paper | ScholarLens