Strengthening the Internal Control to Reduce the Construction Cost
Chen Li
Abstract
Chen Li
Abstract
In the light of the problems existing in the construction cost management of the building construction enterprise, this paper points out that the cost target control in the early stage of the construction and dynamic cost management in the construction stage should be strengthened to reduce effectively the construction cost.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the light of the problems existing in the construction cost management of the building construction enterprise, this paper points out that the cost target control in the early stage of the construction and dynamic cost management in the construction stage should be strengthened to reduce effectively the construction cost.
Key concepts: Cost engineering, Construction management, Cost accounting, Pre-construction services, Risk analysis (engineering), Control (management), Cost control, Construction industry