2005•Electric PowerRequires access

Status quo of AGC in Zhejiang Power Grid and solutions to problems concerned

Zhao Liang

Open publisher page 1 citations

Abstract

This paper introduces the basic system configuration of automatic generation control (AGC) of both master and slave station in Zhejiang power system and the units having AGC function in Zhejiang Province. It summarizes the problems encountered during AGC operation from both power grid and plants, which involve technologies, coordination between grid and plant, grid operation mode and load characteristics etc. It puts forward solutions for the problems and methods and suggestions for making full use of AGC as viewed from management and technology, including enhancing monitoring and evaluation on units to be integrated into the grid, raising accuracy in ultra-short-term load forecasting, realizing combined AGC adjustment of hydropower plants with thermal power plants, setting AGC period reasonably, optimizing control system at AGC master station, and etc.

About this research paper

What this paper is about

This paper introduces the basic system configuration of automatic generation control (AGC) of both master and slave station in Zhejiang power system and the units having AGC function in Zhejiang Province. It summarizes the problems encountered during AGC operation from both power grid and plants, which involve technologies, coordination between grid and plant, grid operation mode and load characteristics etc. It puts forward solutions for the problems and methods and suggestions for making full use of AGC as viewed from management and technology, including enhancing monitoring and evaluation on units to be integrated into the grid, raising accuracy in ultra-short-term load forecasting, realizing combined AGC adjustment of hydropower plants with thermal power plants, setting AGC period reasonably, optimizing control system at AGC master station, and etc.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper introduces the basic system configuration of automatic generation control (AGC) of both master and slave station in Zhejiang power system and the units having AGC function in Zhejiang Province. It summarizes the problems encountered during AGC operation from both power grid and plants, which involve technologies, coordination between grid and plant, grid operation mode and load characteristics etc. It puts forward solutions for the problems and methods and suggestions for making full use of AGC as viewed from management and technology, including enhancing monitoring and evaluation on units to be integrated into the grid, raising accuracy in ultra-short-term load forecasting, realizing combined AGC adjustment of hydropower plants with thermal power plants, setting AGC period reasonably, optimizing control system at AGC master station, and etc.

Key concepts: Automatic Generation Control, Power grid, Electric power system, Thermal power station, Status quo, Grid, Engineering, Hydropower

Related papers

Back to paper searchBrowse research topicsOriginal source
Status quo of AGC in Zhejiang Power Grid and solutions to problems concerned — Research Paper | ScholarLens