Status quo of AGC in Zhejiang Power Grid and solutions to problems concerned
Zhao Liang
Abstract
Zhao Liang
Abstract
This paper introduces the basic system configuration of automatic generation control (AGC) of both master and slave station in Zhejiang power system and the units having AGC function in Zhejiang Province. It summarizes the problems encountered during AGC operation from both power grid and plants, which involve technologies, coordination between grid and plant, grid operation mode and load characteristics etc. It puts forward solutions for the problems and methods and suggestions for making full use of AGC as viewed from management and technology, including enhancing monitoring and evaluation on units to be integrated into the grid, raising accuracy in ultra-short-term load forecasting, realizing combined AGC adjustment of hydropower plants with thermal power plants, setting AGC period reasonably, optimizing control system at AGC master station, and etc.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the basic system configuration of automatic generation control (AGC) of both master and slave station in Zhejiang power system and the units having AGC function in Zhejiang Province. It summarizes the problems encountered during AGC operation from both power grid and plants, which involve technologies, coordination between grid and plant, grid operation mode and load characteristics etc. It puts forward solutions for the problems and methods and suggestions for making full use of AGC as viewed from management and technology, including enhancing monitoring and evaluation on units to be integrated into the grid, raising accuracy in ultra-short-term load forecasting, realizing combined AGC adjustment of hydropower plants with thermal power plants, setting AGC period reasonably, optimizing control system at AGC master station, and etc.
Key concepts: Automatic Generation Control, Power grid, Electric power system, Thermal power station, Status quo, Grid, Engineering, Hydropower