Analysis on Transient Electromagnetic Environment of Substations
Yu Li
Abstract
Yu Li
Abstract
The transient electromagnetic environment of substation threatens safe operation of secondary systems in a substation.This paper analyzes the transient electromagnetic fields generated by lightning stroke and switching operations based on field tests and numerical simulations.The frequency range of switching transient electrical fields is smaller than 15 MHz,their time duration is 8 μs,the main frequency is in the range from DC to 1 MHz,and the rise time is in the range from 0.5 to 1.5 μs.The frequency range of switching transient magnetic fields is smaller than 15 MHz,their time duration is from 8 to 10 μs,the main frequency is in the range from 0.5 to 3 MHz,and the rise time is about 0.25 μs.The suggested maximum transient magnetic and electrical fields generated by switching operations are 400 A/m and 20 kV/m,respectively.The lightning transient magnetic field in substation is suggested as 1 000 A/m.The criterion for electronic system in substation in national electromagnetic compatibility(EMC)standard GB/T 17626.9-1998 is far smaller than the actual value in substation.The transient magnetic field criterion for the EMC test of electronic system is suggested as 1 000 A/m,and the transient electric field of 20 kV/m is suggested as another new criterion for the EMC test of electronic system.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The transient electromagnetic environment of substation threatens safe operation of secondary systems in a substation.This paper analyzes the transient electromagnetic fields generated by lightning stroke and switching operations based on field tests and numerical simulations.The frequency range of switching transient electrical fields is smaller than 15 MHz,their time duration is 8 μs,the main frequency is in the range from DC to 1 MHz,and the rise time is in the range from 0.5 to 1.5 μs.The frequency range of switching transient magnetic fields is smaller than 15 MHz,their time duration is from 8 to 10 μs,the main frequency is in the range from 0.5 to 3 MHz,and the rise time is about 0.25 μs.The suggested maximum transient magnetic and electrical fields generated by switching operations are 400 A/m and 20 kV/m,respectively.The lightning transient magnetic field in substation is suggested as 1 000 A/m.The criterion for electronic system in substation in national electromagnetic compatibility(EMC)standard GB/T 17626.9-1998 is far smaller than the actual value in substation.The transient magnetic field criterion for the EMC test of electronic system is suggested as 1 000 A/m,and the transient electric field of 20 kV/m is suggested as another new criterion for the EMC test of electronic system.
Key concepts: Electromagnetic compatibility, Transient (computer programming), Electrical engineering, Electromagnetic field, Magnetic field, Engineering, Electromagnetic environment, Lightning (connector)