2011•Unpublished venueRequires access

Optimal Layout Design of Flood Discharge and Energy Dissipation of Thin Roller Compacted Arch Dam

Huang Yuan

Open publisher page 0 citations

Abstract

Optimal design of Yunlonghe hydropower station is conducted to the layout of flood discharge and energy dissipation according to the consultant comments on preliminary design and topographic and geologic features of the dissipation area.In the optimal design,the original dam crest spillway drop bucket is changed to combination of flip bucket and drop bucket.In this way,water flows in layer in longitudinal direction and reduces unit width discharge of downstream energy dissipation area,thus the artificial concrete water cushion pond designed downstream of the dam is changed to a natural water cushion pond.The optimal design can solve the difficulty in arranging large drop flood discharge and energy dissipation in deep and narrow valley,ensure the safety of dam and save project investment and provide reference for similar projects.

About this research paper

What this paper is about

Optimal design of Yunlonghe hydropower station is conducted to the layout of flood discharge and energy dissipation according to the consultant comments on preliminary design and topographic and geologic features of the dissipation area.In the optimal design,the original dam crest spillway drop bucket is changed to combination of flip bucket and drop bucket.In this way,water flows in layer in longitudinal direction and reduces unit width discharge of downstream energy dissipation area,thus the artificial concrete water cushion pond designed downstream of the dam is changed to a natural water cushion pond.The optimal design can solve the difficulty in arranging large drop flood discharge and energy dissipation in deep and narrow valley,ensure the safety of dam and save project investment and provide reference for similar projects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Optimal design of Yunlonghe hydropower station is conducted to the layout of flood discharge and energy dissipation according to the consultant comments on preliminary design and topographic and geologic features of the dissipation area.In the optimal design,the original dam crest spillway drop bucket is changed to combination of flip bucket and drop bucket.In this way,water flows in layer in longitudinal direction and reduces unit width discharge of downstream energy dissipation area,thus the artificial concrete water cushion pond designed downstream of the dam is changed to a natural water cushion pond.The optimal design can solve the difficulty in arranging large drop flood discharge and energy dissipation in deep and narrow valley,ensure the safety of dam and save project investment and provide reference for similar projects.

Key concepts: Spillway, Arch dam, Dissipation, Cushion, Weir, Hydropower, Flood myth, Roller-compacted concrete

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimal Layout Design of Flood Discharge and Energy Dissipation of Thin Roller Compacted Arch Dam — Research Paper | ScholarLens