2005•Guizhou Water PowerRequires access

Design of Discharge Dissipation For Goupitan Hydropower Station

Ban Hong-yan

Open publisher page 0 citations

Abstract

The river valley at the dam site of Guopitan Hydropower Station is very narrow.The flow of its food pick is huge,its biggest discharge power is up to 42,000MW,more than ones of most high dams at home and abroad.Therefore,the design of discharge,dissipation and erosion control is one of the key technology problems of the project.Comparing several schemes and researching hydraulic model test,the layout scheme has been recommended that discharge is through orifices on the dam body and a spillway in the bank,cushion dissipater is set out under the dam,pre-excavating impact cavity and bucket dissipation are used.

About this research paper

What this paper is about

The river valley at the dam site of Guopitan Hydropower Station is very narrow.The flow of its food pick is huge,its biggest discharge power is up to 42,000MW,more than ones of most high dams at home and abroad.Therefore,the design of discharge,dissipation and erosion control is one of the key technology problems of the project.Comparing several schemes and researching hydraulic model test,the layout scheme has been recommended that discharge is through orifices on the dam body and a spillway in the bank,cushion dissipater is set out under the dam,pre-excavating impact cavity and bucket dissipation are used.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The river valley at the dam site of Guopitan Hydropower Station is very narrow.The flow of its food pick is huge,its biggest discharge power is up to 42,000MW,more than ones of most high dams at home and abroad.Therefore,the design of discharge,dissipation and erosion control is one of the key technology problems of the project.Comparing several schemes and researching hydraulic model test,the layout scheme has been recommended that discharge is through orifices on the dam body and a spillway in the bank,cushion dissipater is set out under the dam,pre-excavating impact cavity and bucket dissipation are used.

Key concepts: Spillway, Hydropower, Dissipation, Cushion, Erosion, Environmental science, Engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of Discharge Dissipation For Goupitan Hydropower Station — Research Paper | ScholarLens