2010Water Resources and Hydropower EngineeringRequires access

Design and construction of bulkhead of diversion tunnel for a water control project

Niu Wanji

Open publisher page 0 citations

Abstract

The construction of the bulkhead of the diversion tunnel for a water control project has the characteristics such as short construction period,more working intensity,long period of construction under the subzero temperature and difficult to lower temperature naturally;for which the control parameters for the construction of the bulkhead are properly increased compared with the original design values after the careful analysis and demonstration concerned.The monitoring data show that the concrete of the bulkhead has a better operation behavior to satisfy the requirement on its designed function,and then has a certain reference value for the bulkhead of the hydraulic tunnel within the similar region.

About this research paper

What this paper is about

The construction of the bulkhead of the diversion tunnel for a water control project has the characteristics such as short construction period,more working intensity,long period of construction under the subzero temperature and difficult to lower temperature naturally;for which the control parameters for the construction of the bulkhead are properly increased compared with the original design values after the careful analysis and demonstration concerned.The monitoring data show that the concrete of the bulkhead has a better operation behavior to satisfy the requirement on its designed function,and then has a certain reference value for the bulkhead of the hydraulic tunnel within the similar region.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction of the bulkhead of the diversion tunnel for a water control project has the characteristics such as short construction period,more working intensity,long period of construction under the subzero temperature and difficult to lower temperature naturally;for which the control parameters for the construction of the bulkhead are properly increased compared with the original design values after the careful analysis and demonstration concerned.The monitoring data show that the concrete of the bulkhead has a better operation behavior to satisfy the requirement on its designed function,and then has a certain reference value for the bulkhead of the hydraulic tunnel within the similar region.

Key concepts: Bulkhead (partition), Engineering, Tunnel construction, Environmental science, Civil engineering, Geotechnical engineering, Structural engineering