Construction adit bulkhead design for power diversion tunnel of one hydropower station in Xinjiang
Zhang Wan-jun
Abstract
Zhang Wan-jun
Abstract
Combined with the actual conditions of the construction adit of power diversion tunnel of one hydropower station located in Xinjiang Uigur Autonomous Region,an introduction was made on the determination of bulkhead length,the check of the coefficient of sliding resistance,the systematic design of bulkhead structure and closing construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the actual conditions of the construction adit of power diversion tunnel of one hydropower station located in Xinjiang Uigur Autonomous Region,an introduction was made on the determination of bulkhead length,the check of the coefficient of sliding resistance,the systematic design of bulkhead structure and closing construction.
Key concepts: Bulkhead (partition), Hydropower, Engineering, Civil engineering, Structural engineering, Electrical engineering