Analysis of Control and Operation of Matching Sluices in Interchange Project at Old Route of the Yellow River

Jianye Xu

Open publisher page 0 citations

Abstract

Interchange Project at Old Route of the Yellow River was constructed in 1997, composed of the old mantle, the irrigating and draining sluice and outlet sluice. The reformation of bi -direction operation of irrigating and draining sluice and outlet sluice was completed in 2004, which connected the old Yellow River system with the Tongyu River system and changed the hydraulics. Therefore, the modification of sluice gate control and operation method is necessarily. In this paper, based on the analysis of control and operation fact of the reformed sluices , new control and operation method is proposed.

About this research paper

What this paper is about

Interchange Project at Old Route of the Yellow River was constructed in 1997, composed of the old mantle, the irrigating and draining sluice and outlet sluice. The reformation of bi -direction operation of irrigating and draining sluice and outlet sluice was completed in 2004, which connected the old Yellow River system with the Tongyu River system and changed the hydraulics. Therefore, the modification of sluice gate control and operation method is necessarily. In this paper, based on the analysis of control and operation fact of the reformed sluices , new control and operation method is proposed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Interchange Project at Old Route of the Yellow River was constructed in 1997, composed of the old mantle, the irrigating and draining sluice and outlet sluice. The reformation of bi -direction operation of irrigating and draining sluice and outlet sluice was completed in 2004, which connected the old Yellow River system with the Tongyu River system and changed the hydraulics. Therefore, the modification of sluice gate control and operation method is necessarily. In this paper, based on the analysis of control and operation fact of the reformed sluices , new control and operation method is proposed.

Key concepts: Sluice, Hydraulics, Engineering, Hydrology (agriculture), Environmental science, Geology, Geotechnical engineering, Geography