Qinghai-Tibet railway construction of a logistics centre in Naqu soil erosion control measures
Lanbo Guo
Abstract
Lanbo Guo
Abstract
According to the Qinghai-Tibet railway construction of the logistics centre Naqu caused soil erosion causes,characteristics and hazards in the construction of the railway from control of the main areas,borrow field control,spoil(ballast) field control areas and temporary works combat zone to discuss a soil erosion control measures aimed at the construction of the railway project in the prevention of soil erosion provide some useful experience.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the Qinghai-Tibet railway construction of the logistics centre Naqu caused soil erosion causes,characteristics and hazards in the construction of the railway from control of the main areas,borrow field control,spoil(ballast) field control areas and temporary works combat zone to discuss a soil erosion control measures aimed at the construction of the railway project in the prevention of soil erosion provide some useful experience.
Key concepts: Erosion, Erosion control, Environmental science, Hydrology (agriculture), Geotechnical engineering, Geology, Geomorphology