Demolition of a 50 m-high Chimney by Directional Controlled Blasting

Shen Yu-san

Open publisher page 0 citations

Abstract

A demolition method for a 50 m-high chimney by directional controlled blasting under limited field, hardy floor and asymmetric conditions is introduced,which applies way of improving the blasting cut, and the length of the blasting cut is 62% of all circumference, the expected results of directional controlled blasting are obtained.

About this research paper

What this paper is about

A demolition method for a 50 m-high chimney by directional controlled blasting under limited field, hardy floor and asymmetric conditions is introduced,which applies way of improving the blasting cut, and the length of the blasting cut is 62% of all circumference, the expected results of directional controlled blasting are obtained.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A demolition method for a 50 m-high chimney by directional controlled blasting under limited field, hardy floor and asymmetric conditions is introduced,which applies way of improving the blasting cut, and the length of the blasting cut is 62% of all circumference, the expected results of directional controlled blasting are obtained.

Key concepts: Demolition, Chimney (locomotive), Rock blasting, Engineering, Mining engineering, Geology, Civil engineering, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
Demolition of a 50 m-high Chimney by Directional Controlled Blasting — Research Paper | ScholarLens