2010Water Resources and Hydropower EngineeringRequires access

Study on water resources real-time monitoring and dispatching system for water supply area of south main line of Wanjiazhai Yellow River Diversion Project

Meng Jie

Open publisher page 2 citations

Abstract

When the water from the south main line of Wanjiazhai Yellow River Diversion Project is supplied to its water-supply area,the existing surface water,ground water and the water diverted from the Yellow River are integrated together.In order to realize the integrated dispatching,management and allocation of all the three water sources,a water resources real-time monitoring and dispatching system for the water supply area of the south main line of Wanjiazhai Yellow River Diversion Project must be developed with the techniques of information,automatic control and modern decision-making,and then the scope,goal,principles,tasks,system structure,logical structure,functional design,organization,execution,etc.for construction of such a system are deeply studied herein,so as to lay a better basis for constructing the system concerned.

About this research paper

What this paper is about

When the water from the south main line of Wanjiazhai Yellow River Diversion Project is supplied to its water-supply area,the existing surface water,ground water and the water diverted from the Yellow River are integrated together.In order to realize the integrated dispatching,management and allocation of all the three water sources,a water resources real-time monitoring and dispatching system for the water supply area of the south main line of Wanjiazhai Yellow River Diversion Project must be developed with the techniques of information,automatic control and modern decision-making,and then the scope,goal,principles,tasks,system structure,logical structure,functional design,organization,execution,etc.for construction of such a system are deeply studied herein,so as to lay a better basis for constructing the system concerned.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When the water from the south main line of Wanjiazhai Yellow River Diversion Project is supplied to its water-supply area,the existing surface water,ground water and the water diverted from the Yellow River are integrated together.In order to realize the integrated dispatching,management and allocation of all the three water sources,a water resources real-time monitoring and dispatching system for the water supply area of the south main line of Wanjiazhai Yellow River Diversion Project must be developed with the techniques of information,automatic control and modern decision-making,and then the scope,goal,principles,tasks,system structure,logical structure,functional design,organization,execution,etc.for construction of such a system are deeply studied herein,so as to lay a better basis for constructing the system concerned.

Key concepts: Water diversion, Scope (computer science), Water supply, Water resources, Line (geometry), Water resource management, Environmental science, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on water resources real-time monitoring and dispatching system for water supply area of south main line of Wanjiazhai Yellow River Diversion Project — Research Paper | ScholarLens