2003Jorunal of Water Resources and Architectural EngingeeringRequires access

Design of No.20 Dam Section in Lingjintan Hydropower Station

Wenjun Wu

Open publisher page 0 citations

Abstract

The No 20 dam section as described in this paper is situated between the spillway section and the powerhouse section, where a poor geological condition was revealed during excavation and the structural design was complicated. In order to ensure the powerhouse construction during flood season in 1997, the design of this dam section was largely modified. This paper outlines the design of this dam section, including handling measures, joint grouting, calculation and analysis by means of three-dimensional finite element method. The practical operation has justified the success of the dam section design, which has ensured both the power generation on schedule and satisfied the requirements for the safe and reliable operation of the project.

About this research paper

What this paper is about

The No 20 dam section as described in this paper is situated between the spillway section and the powerhouse section, where a poor geological condition was revealed during excavation and the structural design was complicated. In order to ensure the powerhouse construction during flood season in 1997, the design of this dam section was largely modified. This paper outlines the design of this dam section, including handling measures, joint grouting, calculation and analysis by means of three-dimensional finite element method. The practical operation has justified the success of the dam section design, which has ensured both the power generation on schedule and satisfied the requirements for the safe and reliable operation of the project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The No 20 dam section as described in this paper is situated between the spillway section and the powerhouse section, where a poor geological condition was revealed during excavation and the structural design was complicated. In order to ensure the powerhouse construction during flood season in 1997, the design of this dam section was largely modified. This paper outlines the design of this dam section, including handling measures, joint grouting, calculation and analysis by means of three-dimensional finite element method. The practical operation has justified the success of the dam section design, which has ensured both the power generation on schedule and satisfied the requirements for the safe and reliable operation of the project.

Key concepts: Spillway, Section (typography), Hydropower, Excavation, Engineering, Civil engineering, Joint (building), Flood myth

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of No.20 Dam Section in Lingjintan Hydropower Station — Research Paper | ScholarLens