Risk assessment of accident of uncontrolled boron dilution at shutdown condition for PWR
Ke Guotu, Xu Hanming
Abstract
Ke Guotu, Xu Hanming
Abstract
Taking Guangdong Daya Bay Nuclear Power Station for reference plant, the potential accident initiators of uncontrolled boron dilution at shutdown condition for pressurized water reactor is analyzed and classified systematically. Based upon French NPPs operating experience over 750 reactor-years, the PSA method is adopted to evaluate the risk related to such accident. Finally, according to the estimated result some appropriate measures and recommendations to reduce the corresponding risk are proposed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking Guangdong Daya Bay Nuclear Power Station for reference plant, the potential accident initiators of uncontrolled boron dilution at shutdown condition for pressurized water reactor is analyzed and classified systematically. Based upon French NPPs operating experience over 750 reactor-years, the PSA method is adopted to evaluate the risk related to such accident. Finally, according to the estimated result some appropriate measures and recommendations to reduce the corresponding risk are proposed.
Key concepts: Shutdown, Pressurized water reactor, Nuclear engineering, Environmental science, Nuclear power plant, Nuclear power, Dilution, Boron