Probabilistic safety analysis of the 1000 MW PWR during shutdown state
Li Ming Lin
Abstract
Li Ming Lin
Abstract
This paper initiates a study focused on shutdown safety as well as Probability Safety Analysis(PSA) for shutdown operation at 1000 MW PWR.Shutdown PSA models considering different plant outage types are constructed respectively to evaluate the risk of LOI-RRA operation.The results show that the potential risk during shutdown should not be ignored;going through the LOI-RRA operation at cool shutdown refueling outage significantly increases the plant risk.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper initiates a study focused on shutdown safety as well as Probability Safety Analysis(PSA) for shutdown operation at 1000 MW PWR.Shutdown PSA models considering different plant outage types are constructed respectively to evaluate the risk of LOI-RRA operation.The results show that the potential risk during shutdown should not be ignored;going through the LOI-RRA operation at cool shutdown refueling outage significantly increases the plant risk.
Key concepts: Shutdown, Reliability engineering, Probabilistic risk assessment, Engineering, Probabilistic logic, Nuclear engineering, Environmental science, Risk analysis (engineering)