2015Port & Waterway EngineeringRequires access

Influence of estuary regulation project on hydrodynamic conditions in Guanhe estuary

Dong Ji

Open publisher page 1 citations

Abstract

To predict the impact of regulation project on the tidal prism, tidal level and velocity at the Guanhe estuary and provide the optimal regulation plan of the Guanhe estuary,we analyze the natural conditions of the estuary firstly,then build a two-dimensional mathematical model,which is verified by measured filed data,and finally analyze the changes of hydraulic characteristics after the project by the mathematical model. The result shows that waterway dredging project should be carried out with the regulation project because leading jetties can decrease the tidal prism significantly; After implementation of the leading jetty engineering and waterway engineering, the velocity of the flow between the double jetties increases.

About this research paper

What this paper is about

To predict the impact of regulation project on the tidal prism, tidal level and velocity at the Guanhe estuary and provide the optimal regulation plan of the Guanhe estuary,we analyze the natural conditions of the estuary firstly,then build a two-dimensional mathematical model,which is verified by measured filed data,and finally analyze the changes of hydraulic characteristics after the project by the mathematical model. The result shows that waterway dredging project should be carried out with the regulation project because leading jetties can decrease the tidal prism significantly; After implementation of the leading jetty engineering and waterway engineering, the velocity of the flow between the double jetties increases.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To predict the impact of regulation project on the tidal prism, tidal level and velocity at the Guanhe estuary and provide the optimal regulation plan of the Guanhe estuary,we analyze the natural conditions of the estuary firstly,then build a two-dimensional mathematical model,which is verified by measured filed data,and finally analyze the changes of hydraulic characteristics after the project by the mathematical model. The result shows that waterway dredging project should be carried out with the regulation project because leading jetties can decrease the tidal prism significantly; After implementation of the leading jetty engineering and waterway engineering, the velocity of the flow between the double jetties increases.

Key concepts: Jetty, Dredging, Estuary, Coastal engineering, Tidal current, Environmental science, Sluice, Prism

Related papers

Back to paper searchBrowse research topicsOriginal source
Influence of estuary regulation project on hydrodynamic conditions in Guanhe estuary — Research Paper | ScholarLens