Controlled Blasting Techniques in Linxiang-Changshang Expressway's Cutting Excavation
Xu Shun
Abstract
Xu Shun
Abstract
In this paper, controlled blasting techniques in LinXiang-Changshang expressway's cutting excavation, including wide-space blasting, smooth blasting, millisecond blasting between holes and layered millisecond blasting in holes are introduced. By using these techniques, the side-slope is more even, block is well-proportioned, blasting quality is improved, and construction tare of progress and ambience safety can be ensured.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper, controlled blasting techniques in LinXiang-Changshang expressway's cutting excavation, including wide-space blasting, smooth blasting, millisecond blasting between holes and layered millisecond blasting in holes are introduced. By using these techniques, the side-slope is more even, block is well-proportioned, blasting quality is improved, and construction tare of progress and ambience safety can be ensured.
Key concepts: Rock blasting, Excavation, Drilling and blasting, Millisecond, Mining engineering, Engineering, Geotechnical engineering, Block (permutation group theory)