Smooth Blasting Techniques for Excavation of the Tunnel in Guiyang Project

Xie Sheng-quan

Open publisher page 0 citations

Abstract

In excavation of the E part of Dashishan tunnel of Guiyang hinge, the different blasting techniques , such as smooth blasting, millisecond blasting with noel detonators, M shape cutting, and space loading with detonator fuse were used to ensure the quality of the tunnel section. The blasting result shows that the optimized blasting scheme and blasting parameters were effective. The valuable reference has been provided for similar engineering of deep-hole millisecond blasting. The design of blasting scheme, the selection of blasting parameters, charging structure and priming network were introduced.

About this research paper

What this paper is about

In excavation of the E part of Dashishan tunnel of Guiyang hinge, the different blasting techniques , such as smooth blasting, millisecond blasting with noel detonators, M shape cutting, and space loading with detonator fuse were used to ensure the quality of the tunnel section. The blasting result shows that the optimized blasting scheme and blasting parameters were effective. The valuable reference has been provided for similar engineering of deep-hole millisecond blasting. The design of blasting scheme, the selection of blasting parameters, charging structure and priming network were introduced.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In excavation of the E part of Dashishan tunnel of Guiyang hinge, the different blasting techniques , such as smooth blasting, millisecond blasting with noel detonators, M shape cutting, and space loading with detonator fuse were used to ensure the quality of the tunnel section. The blasting result shows that the optimized blasting scheme and blasting parameters were effective. The valuable reference has been provided for similar engineering of deep-hole millisecond blasting. The design of blasting scheme, the selection of blasting parameters, charging structure and priming network were introduced.

Key concepts: Detonator, Rock blasting, Excavation, Millisecond, Engineering, Drilling and blasting, Priming (agriculture), Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Smooth Blasting Techniques for Excavation of the Tunnel in Guiyang Project — Research Paper | ScholarLens