Cast-in-site cantilever construction control of a continuous box girder bridge
Ping Bai
Abstract
Ping Bai
Abstract
River-spanning bridge is longitudinal asymmetry continuous box girder bridge which is difficult for construction. The paper describes the construction control of the bridge. The bridge construction was finished under on site monitor and guide. The elevation error of middle span joining 1s under allowed range, which shows the construction control is successful and provides a good example for cast-in-site cantilever construction control of a continuous box girder bridge.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
River-spanning bridge is longitudinal asymmetry continuous box girder bridge which is difficult for construction. The paper describes the construction control of the bridge. The bridge construction was finished under on site monitor and guide. The elevation error of middle span joining 1s under allowed range, which shows the construction control is successful and provides a good example for cast-in-site cantilever construction control of a continuous box girder bridge.
Key concepts: Bridge (graph theory), Cantilever, Box girder, Structural engineering, Engineering, Span (engineering), Girder, Girder bridge