Analysis and calculation on vertical earth pressure from PCCP pipeline of Mid-route of South-to-North Water Transfer Project

Huiqing Hu

Open publisher page 0 citations

Abstract

The double pipelines of pre-stressed concrete cylinder pipe(PCCP) with the super large diameter of 4 m are adopted in the Mid-route of the South-to-North Water Transfer Project;among which 40% of the length covered with the earth of 5 m thick and the mix.designed earth coverage thickness of 10 m.The calculation method of the vertical earth pressure under various placing conditions for the PCCP pipeline is described herein,and then the calculation results of the placement modes and all the suitable conditions for all the formulas concerned are also presented by taken the construction of the PCCP pipeline of the Mid-route of the South-to-North Water Transfer Project as the study case.The comparison is finally made between both the calculated values and the measured data.

About this research paper

What this paper is about

The double pipelines of pre-stressed concrete cylinder pipe(PCCP) with the super large diameter of 4 m are adopted in the Mid-route of the South-to-North Water Transfer Project;among which 40% of the length covered with the earth of 5 m thick and the mix.designed earth coverage thickness of 10 m.The calculation method of the vertical earth pressure under various placing conditions for the PCCP pipeline is described herein,and then the calculation results of the placement modes and all the suitable conditions for all the formulas concerned are also presented by taken the construction of the PCCP pipeline of the Mid-route of the South-to-North Water Transfer Project as the study case.The comparison is finally made between both the calculated values and the measured data.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The double pipelines of pre-stressed concrete cylinder pipe(PCCP) with the super large diameter of 4 m are adopted in the Mid-route of the South-to-North Water Transfer Project;among which 40% of the length covered with the earth of 5 m thick and the mix.designed earth coverage thickness of 10 m.The calculation method of the vertical earth pressure under various placing conditions for the PCCP pipeline is described herein,and then the calculation results of the placement modes and all the suitable conditions for all the formulas concerned are also presented by taken the construction of the PCCP pipeline of the Mid-route of the South-to-North Water Transfer Project as the study case.The comparison is finally made between both the calculated values and the measured data.

Key concepts: Water transfer, Pipeline (software), Pipeline transport, Water pressure, Geology, Cylinder, Transfer (computing), Environmental science