Study on Monitoring Technology of Overlong Box Culvert Jacking in Meihe Expressway
Xie Fu-gui
Abstract
Xie Fu-gui
Abstract
To make sure of the achievement of the overlong box culvert jacking in highway embankment, it is very necessary to monitor the construction effectively. The monitoring result to the engineering of the culvert jacking in MeiHe expressway shows that there is no bad sedimentation of the road surface or roadbed during jacking, but the backwall can't fulfil the engineering' demand.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To make sure of the achievement of the overlong box culvert jacking in highway embankment, it is very necessary to monitor the construction effectively. The monitoring result to the engineering of the culvert jacking in MeiHe expressway shows that there is no bad sedimentation of the road surface or roadbed during jacking, but the backwall can't fulfil the engineering' demand.
Key concepts: Culvert, Jacking, Engineering, Levee, Settlement (finance), Civil engineering, Forensic engineering, Geotechnical engineering