The construction scheme comparison and selection of soft country rock large-span railway tunnel
Gao Wen-lon
Abstract
Gao Wen-lon
Abstract
Aiming at the importance of selecting proper construction scheme in building large-span tunnel,with the double line station large-span tunnel in Xinyue river tunnel exist end of Xiang-Yu added second line as example,and the center diaphragm method(CD method) and three step method were analyzed theoretically.Three step methods were selected in construction,the construction assignment was completed safely and on schedule,and accumulated the experience of tunnel construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Aiming at the importance of selecting proper construction scheme in building large-span tunnel,with the double line station large-span tunnel in Xinyue river tunnel exist end of Xiang-Yu added second line as example,and the center diaphragm method(CD method) and three step method were analyzed theoretically.Three step methods were selected in construction,the construction assignment was completed safely and on schedule,and accumulated the experience of tunnel construction.
Key concepts: Span (engineering), Schedule, Line (geometry), Tunnel construction, Engineering, Selection (genetic algorithm), Railway tunnel, Scheme (mathematics)