2007Water Conservancy & Electric Power MachineryRequires access

1 000 MW unit boiler feedwater system optimization

Ying Wang

Open publisher page 0 citations

Abstract

Through introduction to the layout of some ordinary feed-water pump sets,a proposal is given to Suizhong Power Plant 's second term project:two 50% turbine driven feedwater pumps.The feasibility of this design is detailed in several aspects.

About this research paper

What this paper is about

Through introduction to the layout of some ordinary feed-water pump sets,a proposal is given to Suizhong Power Plant 's second term project:two 50% turbine driven feedwater pumps.The feasibility of this design is detailed in several aspects.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Through introduction to the layout of some ordinary feed-water pump sets,a proposal is given to Suizhong Power Plant 's second term project:two 50% turbine driven feedwater pumps.The feasibility of this design is detailed in several aspects.

Key concepts: Boiler feedwater, Boiler feedwater pump, Feedwater heater, Boiler (water heating), Turbine, Boiler water, Power station, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
1 000 MW unit boiler feedwater system optimization — Research Paper | ScholarLens