The construction technology of the hollow thin-walled pier turnover formwork in the highway road
LI Jin-lian
Abstract
LI Jin-lian
Abstract
It has an analysis on the Ya-Lu highway C3 contract Yanxigou Bridge 92 m double column construction.Discussing from the choice of mode construction scheme,the component design of turnover formwork and the construction technology of turnover formwork.It has a detailed exposition of the special application on the hollow thin-walled pier construction technology.To provide guide for the similar construction project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It has an analysis on the Ya-Lu highway C3 contract Yanxigou Bridge 92 m double column construction.Discussing from the choice of mode construction scheme,the component design of turnover formwork and the construction technology of turnover formwork.It has a detailed exposition of the special application on the hollow thin-walled pier construction technology.To provide guide for the similar construction project.
Key concepts: Formwork, Pier, Bridge (graph theory), Engineering, Column (typography), Component (thermodynamics), Civil engineering, Structural engineering