Scheme research on configuration of tunnel construction equipment
Xiaowen Wang
Abstract
Xiaowen Wang
Abstract
China is a mountainous country with a large proportion of tunnel building.Tunnel construction in the water conservancy also has a great development.Drilling blast method in tunnel construction can increase the progress of excavation.So,on the basis of summing up the practical experience in tunnel construction,this article studied machinery resource allocation focus on drilling and blasting method in the process of tunnel construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
China is a mountainous country with a large proportion of tunnel building.Tunnel construction in the water conservancy also has a great development.Drilling blast method in tunnel construction can increase the progress of excavation.So,on the basis of summing up the practical experience in tunnel construction,this article studied machinery resource allocation focus on drilling and blasting method in the process of tunnel construction.
Key concepts: Tunnel construction, Drilling and blasting, Excavation, Rock blasting, Drilling, Civil engineering, Engineering, Railway tunnel