2010•Hydropower and New EnergyRequires access

Computer supervisory control system for cascade dispatching of Three Gorges Hydropower Stations

Hua Tan

Open publisher page 0 citations

Abstract

The working principle and operational mode of AGC in cascade hydropower stations are described.Based on the characters of Three Gorges cascade hydropower stations and the operation requirement of AGC,the arithmetic about load distribution both on hinge level and on bus level is proposed.

About this research paper

What this paper is about

The working principle and operational mode of AGC in cascade hydropower stations are described.Based on the characters of Three Gorges cascade hydropower stations and the operation requirement of AGC,the arithmetic about load distribution both on hinge level and on bus level is proposed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The working principle and operational mode of AGC in cascade hydropower stations are described.Based on the characters of Three Gorges cascade hydropower stations and the operation requirement of AGC,the arithmetic about load distribution both on hinge level and on bus level is proposed.

Key concepts: Cascade, Hydropower, Three gorges, Mode (computer interface), Engineering, Control (management), Automotive engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Computer supervisory control system for cascade dispatching of Three Gorges Hydropower Stations — Research Paper | ScholarLens