The Monitoring and Analysis of Surrounding Rock On the Guan Jiao Tunnel Excavation
Ling Wenchang
Abstract
Ling Wenchang
Abstract
In the tunnel NATM design concept,Monitoring and Survey of Tunnel NATM becomes an important part,For controlling the real-time characteristics of surrounding rock deformation and supporting structure in the Qinghai-Tibet railway guan jiao tunnel,by adopting the JSS30A digital convergence meter,monitoring the peripheral displacement and dome subsidence of the rock,researching the rock mechanics condition,foreseeing and confirming the stabilize time.This is of important meaning to the safety construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the tunnel NATM design concept,Monitoring and Survey of Tunnel NATM becomes an important part,For controlling the real-time characteristics of surrounding rock deformation and supporting structure in the Qinghai-Tibet railway guan jiao tunnel,by adopting the JSS30A digital convergence meter,monitoring the peripheral displacement and dome subsidence of the rock,researching the rock mechanics condition,foreseeing and confirming the stabilize time.This is of important meaning to the safety construction.
Key concepts: New Austrian Tunnelling method, Guan, Excavation, Geotechnical engineering, Geology, Displacement (psychology), Engineering, Subsidence