Construction Technology of Deep Water Bored Pile of Bridge
Cccc Second
Abstract
Cccc Second
Abstract
With the construction of large bridge crossing over river and sea one by one and the span larger and larger,the superlong and large diameter bored pile are broadly used in the construction of large deep water bridge,the technical requirement for the foundation are higher and higher.Combining the practical project,the construction technique of deep water bored pile and key control point during construction period for large bridge are introduced.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
With the construction of large bridge crossing over river and sea one by one and the span larger and larger,the superlong and large diameter bored pile are broadly used in the construction of large deep water bridge,the technical requirement for the foundation are higher and higher.Combining the practical project,the construction technique of deep water bored pile and key control point during construction period for large bridge are introduced.
Key concepts: Pile, Bridge (graph theory), Deep water, Foundation (evidence), Span (engineering), Engineering, Pile cap, Geotechnical engineering