Survey on Rural Drinking Water Safety Projects and the Status of Hygienic Quality of Water,Qingzhou City,2011
Hongqin Zhang
Abstract
Hongqin Zhang
Abstract
[Objective]To understand the status of rural drinking water safety projects,so as to provide scientific basis for construction of rural drinking projects.[Methods]In 2011,the water samples were collected and tested from the finished water and twig water in dry season and rain season in 951 rural drinking water safety projects.[Results]A total of 768 source water surveyed were all underground water,767were not disinfected.1 690 water samples from 951 rural drinking water safety projects were detected,the passing rate of water was 21.28%,the passing rate of finished water and twig water was 21.24% and 21.14%(P0.05);and was 40.00%,15.79%,and 20.91%(P0.05)in city network expansion projects,closely village water projects,a village water projects.The rate above the norm in nitrates,the total bacteria,total colony,coliform group was 20.65%,46.75%,61.36%,and 55.56%.[Conclusion]The qualified rate o f drinking water is lower in rural areas of Qingzhou city,the water sources are seriously contaminated.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
[Objective]To understand the status of rural drinking water safety projects,so as to provide scientific basis for construction of rural drinking projects.[Methods]In 2011,the water samples were collected and tested from the finished water and twig water in dry season and rain season in 951 rural drinking water safety projects.[Results]A total of 768 source water surveyed were all underground water,767were not disinfected.1 690 water samples from 951 rural drinking water safety projects were detected,the passing rate of water was 21.28%,the passing rate of finished water and twig water was 21.24% and 21.14%(P0.05);and was 40.00%,15.79%,and 20.91%(P0.05)in city network expansion projects,closely village water projects,a village water projects.The rate above the norm in nitrates,the total bacteria,total colony,coliform group was 20.65%,46.75%,61.36%,and 55.56%.[Conclusion]The qualified rate o f drinking water is lower in rural areas of Qingzhou city,the water sources are seriously contaminated.
Key concepts: Water quality, Water safety, Environmental science, Sanitation, Rural area, Environmental health, Water resource management, Environmental engineering