2011Journal of Heilongjiang Institute of TechnologyRequires access

Grouting of bored pile technique

Peng Zhong-wei

Open publisher page 0 citations

Abstract

Based on Dongguan,Guangdong Dongguan Hui GHZ-2 inter-city transport Metro Section of the Central underground station construction site to bored pile and pile pressure grouting field test of the static load test,introduced in the process of pressure grouting pile bottom and pressure grouting effect,the main research bored piles and piles construction technology,including the build drilling platforms,casing,drilling,placement of reinforced concrete cages and water processes;and sediment for the bored pile problem;the grouting of pile testing of new technology is studied.

About this research paper

What this paper is about

Based on Dongguan,Guangdong Dongguan Hui GHZ-2 inter-city transport Metro Section of the Central underground station construction site to bored pile and pile pressure grouting field test of the static load test,introduced in the process of pressure grouting pile bottom and pressure grouting effect,the main research bored piles and piles construction technology,including the build drilling platforms,casing,drilling,placement of reinforced concrete cages and water processes;and sediment for the bored pile problem;the grouting of pile testing of new technology is studied.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on Dongguan,Guangdong Dongguan Hui GHZ-2 inter-city transport Metro Section of the Central underground station construction site to bored pile and pile pressure grouting field test of the static load test,introduced in the process of pressure grouting pile bottom and pressure grouting effect,the main research bored piles and piles construction technology,including the build drilling platforms,casing,drilling,placement of reinforced concrete cages and water processes;and sediment for the bored pile problem;the grouting of pile testing of new technology is studied.

Key concepts: Pile, Casing, Drilling, Geotechnical engineering, Engineering, Geology, Petroleum engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Grouting of bored pile technique — Research Paper | ScholarLens