Casing Repair Technique by Running 4 in Casing into 5(1/2) in Casing in Deep Wells
Tian Weizhi
Abstract
Tian Weizhi
Abstract
A study is carried out on deep well casing repair technique by running 4 in casing in 51/2 in casing in Huzhuangji Oilfield so as to improve waterflood well pattern, and handle interbed contradictions by stratification. Its main technical principle and technical indexes in operation are discussed. The result of application shows that well conditions are improved and its purposes of oil increment and stimulation improving are achieved.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A study is carried out on deep well casing repair technique by running 4 in casing in 51/2 in casing in Huzhuangji Oilfield so as to improve waterflood well pattern, and handle interbed contradictions by stratification. Its main technical principle and technical indexes in operation are discussed. The result of application shows that well conditions are improved and its purposes of oil increment and stimulation improving are achieved.
Key concepts: Casing, Petroleum engineering, Geology, Workover, Engineering