2013•Unpublished venueRequires access

A Brownfield Well Re-Design with Casing While Drilling

Arjan Vos, Ibrahim Kamyani, Robert Hilditch, Francisco Sanchez

Open publisher page 1 citations

Abstract

Abstract Developments with high depletion tend to have many drilling problems where young shales need to be drilled and losses are incurred. In order to avoid spending large amounts of time and money curing losses, a complete re-design has been carried out in a field in the North of the Sultanate of Oman. The casing scheme for the wells has been successfully reduced from four to two casings, making use of a hydraulic single joint rig. Furthermore, casing while drilling with stage cementing tools has been trialed, whereby the stage tools are drilled out with the casing while drilling bit. Many lessons have been learned as described in this paper.

About this research paper

What this paper is about

Abstract Developments with high depletion tend to have many drilling problems where young shales need to be drilled and losses are incurred. In order to avoid spending large amounts of time and money curing losses, a complete re-design has been carried out in a field in the North of the Sultanate of Oman. The casing scheme for the wells has been successfully reduced from four to two casings, making use of a hydraulic single joint rig. Furthermore, casing while drilling with stage cementing tools has been trialed, whereby the stage tools are drilled out with the casing while drilling bit. Many lessons have been learned as described in this paper.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Developments with high depletion tend to have many drilling problems where young shales need to be drilled and losses are incurred. In order to avoid spending large amounts of time and money curing losses, a complete re-design has been carried out in a field in the North of the Sultanate of Oman. The casing scheme for the wells has been successfully reduced from four to two casings, making use of a hydraulic single joint rig. Furthermore, casing while drilling with stage cementing tools has been trialed, whereby the stage tools are drilled out with the casing while drilling bit. Many lessons have been learned as described in this paper.

Key concepts: Casing, Drilling, Petroleum engineering, Geology, Drilling engineering, Engineering, Mining engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
A Brownfield Well Re-Design with Casing While Drilling — Research Paper | ScholarLens