Study on factors of removal of COD_(cr) from old landfill leachate by fenton reagent

Tao Huchun

Open publisher page 0 citations

Abstract

The factors that affected the removal of chemical oxygen demand(CODcr) from old landfill leachate treated by Fenton reagent, such as sample's initial pH value, H2O2/Fe2+ dosing ratio, H2O2 dosage and reaction time were investigated in this paper. The results showed that the optimal condition as following, initial pH value of landfill leachate was 4, H2O2/Fe2+ dosing ratio was 5:1, H2O2 dosage was 0.05 mol·L-1 and reaction time was 2.5 h. As a result, the removal rate of CODcr from Old landfill leachate was 73.1% under this condition.

About this research paper

What this paper is about

The factors that affected the removal of chemical oxygen demand(CODcr) from old landfill leachate treated by Fenton reagent, such as sample's initial pH value, H2O2/Fe2+ dosing ratio, H2O2 dosage and reaction time were investigated in this paper. The results showed that the optimal condition as following, initial pH value of landfill leachate was 4, H2O2/Fe2+ dosing ratio was 5:1, H2O2 dosage was 0.05 mol·L-1 and reaction time was 2.5 h. As a result, the removal rate of CODcr from Old landfill leachate was 73.1% under this condition.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The factors that affected the removal of chemical oxygen demand(CODcr) from old landfill leachate treated by Fenton reagent, such as sample's initial pH value, H2O2/Fe2+ dosing ratio, H2O2 dosage and reaction time were investigated in this paper. The results showed that the optimal condition as following, initial pH value of landfill leachate was 4, H2O2/Fe2+ dosing ratio was 5:1, H2O2 dosage was 0.05 mol·L-1 and reaction time was 2.5 h. As a result, the removal rate of CODcr from Old landfill leachate was 73.1% under this condition.

Key concepts: Leachate, Reagent, Fenton's reagent, Chemical oxygen demand, Chemistry, Environmental chemistry, Biodegradation, Hydrogen peroxide