Abstract

The excavation process of an underground power plant was simulated by using three-dimensional elastic-plastic finite element method.The changes of the displacement and stress of the surrounding rock around the cave is analyzed.The calculation and analysis result show that the stability of the cave is poor and the rock excavation deformation is larger as the surrounding rock is much more broken,the supporting structure should be constructed in time.

About this research paper

What this paper is about

The excavation process of an underground power plant was simulated by using three-dimensional elastic-plastic finite element method.The changes of the displacement and stress of the surrounding rock around the cave is analyzed.The calculation and analysis result show that the stability of the cave is poor and the rock excavation deformation is larger as the surrounding rock is much more broken,the supporting structure should be constructed in time.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The excavation process of an underground power plant was simulated by using three-dimensional elastic-plastic finite element method.The changes of the displacement and stress of the surrounding rock around the cave is analyzed.The calculation and analysis result show that the stability of the cave is poor and the rock excavation deformation is larger as the surrounding rock is much more broken,the supporting structure should be constructed in time.

Key concepts: Excavation, Geotechnical engineering, Geology, Cave, Displacement (psychology), Finite element method, Deformation (meteorology), Hydropower