2012Mining Safety & Environmental ProtectionRequires access

Study on Ventilation Technology for Drivage of Long-distance Blind Headway

Li Xi

Open publisher page 0 citations

Abstract

In this paper,a ventilation scheme for drivage of a long-distance blind roadway was proposed according to the conditions at the construction site of a tunnel.Forced ventilation was selected and one-stop ventilation was adopted through the comparison of the advantages and disadvantages of forced ventilation,exhaust ventilation and overlap auxiliary ventilation;large-diameter air duct and multi-stage tunneling fan were used,and the ventilation distance was up to 15 km.The use of forced ventilation can directly supply fresh air to the heading face to meet the ventilation demand for tunnel construction.

About this research paper

What this paper is about

In this paper,a ventilation scheme for drivage of a long-distance blind roadway was proposed according to the conditions at the construction site of a tunnel.Forced ventilation was selected and one-stop ventilation was adopted through the comparison of the advantages and disadvantages of forced ventilation,exhaust ventilation and overlap auxiliary ventilation;large-diameter air duct and multi-stage tunneling fan were used,and the ventilation distance was up to 15 km.The use of forced ventilation can directly supply fresh air to the heading face to meet the ventilation demand for tunnel construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In this paper,a ventilation scheme for drivage of a long-distance blind roadway was proposed according to the conditions at the construction site of a tunnel.Forced ventilation was selected and one-stop ventilation was adopted through the comparison of the advantages and disadvantages of forced ventilation,exhaust ventilation and overlap auxiliary ventilation;large-diameter air duct and multi-stage tunneling fan were used,and the ventilation distance was up to 15 km.The use of forced ventilation can directly supply fresh air to the heading face to meet the ventilation demand for tunnel construction.

Key concepts: Ventilation (architecture), Duct (anatomy), Engineering, Marine engineering, Automotive engineering, Mechanical engineering, Medicine, Surgery

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Ventilation Technology for Drivage of Long-distance Blind Headway — Research Paper | ScholarLens