Comprehensive evaluation of hydropower project scheme based on analysis of fuzzy- set pair

Zhang Hengqua

Open publisher page 0 citations

Abstract

Aimed at the investment risk which is brought from the subjectivity and randomness of owners or investors in evaluation of hydropower project scheme,taking the four project schemes of hydropower station for example,the paper established the evaluation index system of hydropower project based on method of fuzzy comprehensive evaluation. On the basis,combining method of fuzzy comprehensive evaluation,the paper constructed membership function and fuzzy- set pair analysis which reflected the characteristics of same- indefinite- contrary system. Then it put forward the evaluation model based on analysis of fuzzy- set pair. Meanwhile,the weight of each index was determined by vatiation coefficient method. The connection degree and set pair potential were gotten through classifying plan index level of evaluation and constructing connection degree function. The paper finally gave the development trend and uncertainty rank of comprehensive level of every scheme of hydropower project so as to heighten the optimization efficiency of project scheme and reduce the investment risk of owner or investor.

About this research paper

What this paper is about

Aimed at the investment risk which is brought from the subjectivity and randomness of owners or investors in evaluation of hydropower project scheme,taking the four project schemes of hydropower station for example,the paper established the evaluation index system of hydropower project based on method of fuzzy comprehensive evaluation. On the basis,combining method of fuzzy comprehensive evaluation,the paper constructed membership function and fuzzy- set pair analysis which reflected the characteristics of same- indefinite- contrary system. Then it put forward the evaluation model based on analysis of fuzzy- set pair. Meanwhile,the weight of each index was determined by vatiation coefficient method. The connection degree and set pair potential were gotten through classifying plan index level of evaluation and constructing connection degree function. The paper finally gave the development trend and uncertainty rank of comprehensive level of every scheme of hydropower project so as to heighten the optimization efficiency of project scheme and reduce the investment risk of owner or investor.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aimed at the investment risk which is brought from the subjectivity and randomness of owners or investors in evaluation of hydropower project scheme,taking the four project schemes of hydropower station for example,the paper established the evaluation index system of hydropower project based on method of fuzzy comprehensive evaluation. On the basis,combining method of fuzzy comprehensive evaluation,the paper constructed membership function and fuzzy- set pair analysis which reflected the characteristics of same- indefinite- contrary system. Then it put forward the evaluation model based on analysis of fuzzy- set pair. Meanwhile,the weight of each index was determined by vatiation coefficient method. The connection degree and set pair potential were gotten through classifying plan index level of evaluation and constructing connection degree function. The paper finally gave the development trend and uncertainty rank of comprehensive level of every scheme of hydropower project so as to heighten the optimization efficiency of project scheme and reduce the investment risk of owner or investor.

Key concepts: Hydropower, Randomness, Fuzzy logic, Scheme (mathematics), Set (abstract data type), Membership function, Index (typography), Operations research