2008Qiaoliang jiansheRequires access

Research of Design and Construction Techniques for Temporary Piers of Main Bridge of Shanghai Changjiang River Bridge

LI Zong-ping

Open publisher page 0 citations

Abstract

In this paper,the mechanisms of temporary pier arrangement for long span cable-stayed bridges are analyzed,the situations of the pier arrangement for the cable-stayed bridges at home and abroad are investigated and the structural features of the main bridge of Shanghai Changjiang River Bridge,the plan arrangement and structural design principles of the temporary piers for the Bridge are introduced.On the basis of the simulation analysis and research of the key load cases,the considerations of construction techniques for the inserted and synchronous hydraulically-lifted temporary piers are put forward and successfully applied for the first time.

About this research paper

What this paper is about

In this paper,the mechanisms of temporary pier arrangement for long span cable-stayed bridges are analyzed,the situations of the pier arrangement for the cable-stayed bridges at home and abroad are investigated and the structural features of the main bridge of Shanghai Changjiang River Bridge,the plan arrangement and structural design principles of the temporary piers for the Bridge are introduced.On the basis of the simulation analysis and research of the key load cases,the considerations of construction techniques for the inserted and synchronous hydraulically-lifted temporary piers are put forward and successfully applied for the first time.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In this paper,the mechanisms of temporary pier arrangement for long span cable-stayed bridges are analyzed,the situations of the pier arrangement for the cable-stayed bridges at home and abroad are investigated and the structural features of the main bridge of Shanghai Changjiang River Bridge,the plan arrangement and structural design principles of the temporary piers for the Bridge are introduced.On the basis of the simulation analysis and research of the key load cases,the considerations of construction techniques for the inserted and synchronous hydraulically-lifted temporary piers are put forward and successfully applied for the first time.

Key concepts: Pier, Bridge (graph theory), Engineering, Span (engineering), Civil engineering, Structural engineering, Beam bridge, Plan (archaeology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Research of Design and Construction Techniques for Temporary Piers of Main Bridge of Shanghai Changjiang River Bridge — Research Paper | ScholarLens