Design of Phase I project of the Guniusha waterway channel regulation in the middle Reach of the Yangtze River
Cai Da-fu
Abstract
Cai Da-fu
Abstract
Based on the analysis and research of the natural conditions,features,variation influencing factors,variation tendency and navigation-obstructing characteristics of Guniusha waterway,the plans of the overall and phase Ⅰ project of this waterway were presented.The design of regulation structure and dredging-cut was carried out.The stability of regulation structure and dredging-cut meet the design requirements.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the analysis and research of the natural conditions,features,variation influencing factors,variation tendency and navigation-obstructing characteristics of Guniusha waterway,the plans of the overall and phase Ⅰ project of this waterway were presented.The design of regulation structure and dredging-cut was carried out.The stability of regulation structure and dredging-cut meet the design requirements.
Key concepts: Dredging, Channel (broadcasting), Yangtze river, Civil engineering, Phase (matter), Environmental science, Engineering, Marine engineering